Skip to content Skip to sidebar Skip to footer

Module scaffolding offers the scaffolder full flexibility thanks to the special connection technology. Plates that are fitted to the verticals every 50cm make it possible to install and expand in all directions. 

Cuplock Systems

Verticals are provided in various sizes with cup joints welded at 500mm intervals. The captive mobile top cups are malleable casting intervals. The captive mobile top cups are malleable casting to withstand rough site handling, and welded bottom cups are pressed from high-quality steel. Integral spigots, 150 mm long, are provided at the top of each vertical for making Vertical Connections. These Spigots are drilled to receive locking pins, where uplift is problem.

H Frame

Tubes Systems

Erection Systems

Dubai Office

Ras Al Khor —
P.O.Box 71957, Dubai, UAE
Tel: +971 4 3333 7012
Fax: +971 4 333 7154

Jebel Ali Office

National Industries Park —
P.O.Box 71957, Dubai, UAE
Tel: +971 4 323 2266

Abu Dhabi Office

Abu Dhabi
P.O.Box 92269, Abu Dhabi, UAE
Tel: +971 2 553 8330
Fax: +971 2 553 8331

Ajman Office

Ajman
P.O.Box 2611, Ajman, UAE
Tel: +971 6 539 6655
Fax: +971 6 539 6672

Cornish Scaffolding

Noida, India —
Shop No. 311, T/F, Plot No. 192 Mamram East Plaza, Mayur Vihar Phase-3
Delhi – 110096
Tel: +91-8010933900
Web: www.cornish.in

Translite Scaffolding - India

Noida, India —
B-42, Block – B, Sector 80, Noida, UP 201305.
Tel: +91-8800813050
Web: translitescaffolding.com

Get In Touch

Please, be informed, that the intellectual property rights to all the photos, designs and other materials on this Site belong to  “Desarch Scaffolding” LLC. You may request permission to use them by contacting us at: privacy@desarchscaffolding.com

Desarch Scaffoldings © 2021. All Rights Reserved.